Articles

The size of the canopy of sour cherry trees depends on the time of pruning

Published:
June 20, 2006
Author
View
Keywords
License

Copyright (c) 2018 International Journal of Horticultural Science

This is an open access article distributed under the terms of the Creative Commons Attribution License (CC BY 4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

How To Cite
Selected Style: APA
Gonda, I. (2006). The size of the canopy of sour cherry trees depends on the time of pruning. International Journal of Horticultural Science, 12(3), 49-52. https://doi.org/10.31421/IJHS/12/3/658
Abstract

The intensive culture of sour cherry is achieved by training of trees to form smaller canopies not by means of dwarfing rootstocks but by growth moderation techniques. The rootstocks traditionally used cause vigorous growth, and it is up to the technology to apply procedures less utilised earlier for that purpose. One of those techniques is the transfer of hibernal pruning to the estival period. The best term of the latter is the period of 1-3 weeks after fruit harvest.

The prolongation of the period of favourable illumination and the reduction of the canopy size facilitate higher densities of planting (number of trees per hectare) and a better exploitation of the crown (specific yield). The regular use of summer pruning resulted also in a better quality of fruit.