Search

Published After
Published Before

Search Results

  • Principles of Three-Dimensional Computer Design for Understanding Impossible Figures
    167-173
    Views:
    120

    For a better understanding of the impossible figures, it is advisable to use modern technological means by which the design of the geometry of the models gives a complete understanding of how they are made. Computer-aided 3D design completely solves this problem. That is, on the one hand, the ultimate visual variant of impossible figures is created, on the other hand, there is the possibility for real manipulation, movement, rotation and other models of space. In this study, 3D models of impossible figures are fully constructed, which are applied in the educational process in order to develop logical thinking. The steps of creating 3D geometry using open source software Blender 3D are described in details.

  • Changeable requirements & Answers With a dynamic system in order to continual improvement of the environmental performance of a rubber industrial big company
    81-90
    Views:
    98

    The topic of this article is the analysis of the changeable environmental requirements for the Environmental Management Systems (EMS) of the companies. The strengthened environmental criteria of the 21st century creates new challenges for the participants of the business sphere. In order to satisfy the criteria of the stakeholders, it is necessary to build out a - by the top management - preferred and proactive EMS that can contain also a life cycle thinking method. This logic is supported by the new ISO14001:2015 standard, too. In the first part of the article the stakeholder conception and the new standard model is presented based on literature analysis. The second part of the article presents an environmental management tool developed by a multinational, tyre company. The model combines the stakeholder conception, the requirements and the life cycle assessment (LCA) in order to respond to the new environmental management challenges. The last part of the article closes with the new development possibilities of the presented environmental management tool worked out by the author.

  • Battery Measurement Methods and Artificial Intelligence Applied in Energy Management Systems
    428-436
    Views:
    116

    Diagnostics of batteries using advanced methods have gained remarkable roles in the past few years. This study focuses on the type of measurements, tests and methods to reveal and classify them. During manufacturing and operation several faults could emerge in batteries including non-optimal operation conditions, operators without experience, and finally, random changes in batteries under physical and nonphysical conditions. Improper handling of batteries and battery cells man cause operation failures or, in the worst case, accidents. To reveal these problems several methods are applied in industry and in scientific laboratories. For a comprehensive analysis of battery management, artificial intelligence and Industry 4.0 methods can be used very effectively. Big Data analysis in its standard form is not a new achievement, but other mathematical tools could be applied to control monitoring such as Fuzzy Logic or Support Vector Machine (SVM). They are efficient tools to analyse the deviation of batteries condition because it can detect sudden changes, parameter deviations and anomalies, and the user’s behaviour and habits. This article gives a description about the most important battery testing methods and the connection between Big Data and Operation Management with Artificial Intelligent (AI) methods.

  • Improving the Work Breakdown Structure of the Plant Installation - Case: Asphalt Plant
    174-187
    Views:
    336

    The improvement of the project management forced the industrial organizations to focus on using the project management techniques in their industry, to plan and control the workflow to achieve their targets, further to increase the satisfaction of their customers. One of the most common project management tools are used is the work breakdown structure (WBS), which provide a framework for the implementation of the project scope including project planning, scheduling, monitoring, control, and estimation. Depending on the top-down approach the project activities will be broken into smaller parts that can be measured and controlled during the project implementation. The well-defined construction of the structure contributes to making the project more realistic and visual. However, the misunderstanding of the project WBS among the project team creates deflection and misinterpretation of the project scope. The main issue of this research is to improve the WBS of the installation plan and develop a standard WBS for plant installation. The research was limited to Asphalt plant installation WBS as a case study to identify the weaknesses of the current WBS at the case company which leads to extra installation time and cost. The research is offering a template WBS based on the company logic, defining the frequent risks that affect the plant installation based on the WBS and suggesting a suitable response strategy by recommending a control framework to monitor and control the WBS schedule throughout all installation phases.

  • Compare the Most Frequently Used Models of Risk Management
    1-11
    Views:
    161

    The successful risk management is based on the company can recognize and treat the risks well and effectively. Nowadays there are several techniques for risk management. Each technique breaks the risk management steps on its own logic. In this article we compare four different risk management models, accordingly what are the similarities, and what are the differences between the four models.

Database Logos