Search
Search Results
-
Experimental Investigation on the Properties of Borneo Soft Soil Stabilized with Industrial Waste
25-37Views:350This research aims to investigate the physical and mechanical properties of soft soil stabilized using industrial wastes, namely fly ash and rice husk ash. For this purpose, 6 (six) variations in the composition of fly ash (F), lime (L), and rice husk ash (R) were prepared. The variations in sample composition are SFLR1 (F: 15%, L: 2.5%, R: 5%), SFLR2 (F: 20%, L: 2.5%, R: 5%), SFLR3 (F: 25%, L: 2.5%, R: 5%), SFLR4 (F: 15%, L: 5%, R: 10%), SFLR5 (F: 20%, L: 5%, R: 10%) and SFLR6 (F: 25%, L: 5%, R: 10%). Meanwhile, soft soil was obtained from Banjarmasin City in South Borneo. The sample's physical properties were analyzed using the Atterberg limit test. Moreover, the California Bearing Ratio (CBR) and direct share tests are conducted to assess the sample's mechanical properties. The research results can provide confidence that fly ash, lime, and rice husk ash have the potential to improve the physical and mechanical properties of Borneo soft soil. The results of the Atterberg limit test show that industrial wastes can lower the liquid limit and increase the plastic limit; thus, the soil plasticity index decreases. As for the CBR test results, the untreated soft soil bearing ratio value of 1.4% can be increased to 2.6% after being treated with industrial wastes. In addition, using industrial wastes also decreases the swelling of the soil. Moreover, it can be seen that greater use of fly ash can improve the mechanical properties of the soft soil. However, increasing the composition of lime and rice husk ash can reduce the mechanical properties of the soft soil. Based on the experimental results, it is proposed to use SFLR3 as soil stabilization mixtures.
-
Factors Influencing Project Owner Satisfaction with Supervision Consultants in Public Building Projects
1-21Views:21The construction supervision consultant is an appointed party responsible for overseeing the implementation of construction projects from start to finish. The satisfaction level of project owners with the consultant’s performance is a key indicator of project success. This study aims to determine the level of satisfaction and key factors influencing it in public building projects. A quantitative method was employed by distributing questionnaires to respondents from the Public Works Office, particularly within the Cipta Karya Division in Tapin Regency, which serves as the case study location. Data were analyzed using the Customer Satisfaction Index (CSI) and Importance Performance Analysis (IPA) methods. The results showed that overall, the consultant’s performance was rated as very satisfactory, with the highest CSI score on the communication indicator (86.64%) and the ability to ensure and improve work quality (85.33%). The lowest CSI score was found in the documentation/administration indicator (80.11%). Although the CSI score indicates a high level of satisfaction, there is still room for improvement, particularly in administrative aspects and understanding of technical regulations. The IPA analysis also shows that several indicators fall under top priority, such as documentation/administration, supervision, internal human resources, communication, and the ability to ensure and enhance work quality. The improvement strategies proposed include training, high discipline, and effective communication.