Environmental Engineering

The impact of realization of solar power plant installation requests in Mandatory Purchase (KÁT) system on the electricity supply of Hungarian settlements

Published:
June 6, 2019
Author
View
License

Copyright (c) 2019 by the authors

Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

How To Cite
Selected Style: APA
Kulcsár, B. (2019). The impact of realization of solar power plant installation requests in Mandatory Purchase (KÁT) system on the electricity supply of Hungarian settlements. International Journal of Engineering and Management Sciences, 4(2), 54-60. https://doi.org/10.21791/IJEMS.2019.2.6.
Abstract

The support system of renewable energy production was changed in Hungary in 2017. The legislator created the Mandatory Purchase (KÁT) system earlier to encourage the electricity production from renewable energy sources and waste. The Renewable Energy Subsidy System (Metár) changed the Mandatory Purchase (KÁT) system from the 1st of January in 2017. It had been known before Metár came into force that the supported period in the Matár would be only 13 years while it was 25 years in the KÁT. Therefore, a real rush started for the KÁT support licenses in 2016 in order to make more beneficial contracts by the investors. At the time, the Hungarian Energy and Public Utility Regulatory Authority (MEKH) released a record amount of licenses (more than 2000 pieces) to build solar power plants under 500 kW performance. This is more than 1000 MW total power. This paper searches the answer how this solar power plants will influence the level of self-sufficiency of the Hungarian settlements in the electricity supply if those are realized. Hereinafter, we will analyze the possible impact of these solar power plants in the settlement electricity self-sufficiency.

Database Logos