Civil Engineering

Technical Issues and Their Effect on the Financial and Time Scheduling of the Building Under Roof and/or Floor Upbuilding

Published:
July 7, 2018
Author
View
License

Copyright (c) 2018 by the authors

Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

How To Cite
Selected Style: APA
Lámer, G. (2018). Technical Issues and Their Effect on the Financial and Time Scheduling of the Building Under Roof and/or Floor Upbuilding. International Journal of Engineering and Management Sciences, 3(3), 324-343. https://doi.org/10.21791/IJEMS.2018.3.27.
Abstract

Building under roof and/or floor upbuilding raises technical issues different as one raise in the case of green investments. Primarily, depending of system of building constructions of the existing building there is a possibility to build under roof, and/or floor upbuilding. In the paper we review those technical issues, what decide, that in the case of given building there is or not possibility to build under roof, and/or floor upbuilding. We examine in general, that in the case of building under roof, and/or floor upbuilding what building process should be considered, and what kind of time and financial scheduling is advisable to prescribe. We will present a case study, that the inadequate processing of technical issues may require time and financial rescheduling.

Database Logos