[1]
Mezősi, B. 2014. Application of lead time analysis as a method in EU co-funded mid-term programme evaluations in 2007–2013: the case of Bulgaria and Malta. Acta Agraria Debreceniensis. 61 (Sep. 2014), 9–14. DOI:https://doi.org/10.34101/actaagrar/61/2031.