Pusztai, L. ., Kocsi, B., Budai, I., & Nagy, L. (2018). Analysis of Activity Times in the Process of a Wooden Box Manufacturing. International Journal of Engineering and Management Sciences, 3(4), 475-484. https://doi.org/10.21791/IJEMS.2018.4.39.