Lámer, G. (2018). Technical Issues and Their Effect on the Financial and Time Scheduling of the Building Under Roof and/or Floor Upbuilding. International Journal of Engineering and Management Sciences, 3(3), 324-343. https://doi.org/10.21791/IJEMS.2018.3.27.