(1)
Lámer, G. Technical Issues and Their Effect on the Financial and Time Scheduling of the Building Under Roof and Or Floor Upbuilding. IJEMS 2018, 3 (3), 324-343. https://doi.org/10.21791/IJEMS.2018.3.27..