[1]
Lámer, G. 2018. Technical Issues and Their Effect on the Financial and Time Scheduling of the Building Under Roof and/or Floor Upbuilding. International Journal of Engineering and Management Sciences. 3, 3 (Jul. 2018), 324–343. DOI:https://doi.org/10.21791/IJEMS.2018.3.27..